如何正确开关EVA 4000/4100/6000/6100/8000/8100
1. Start HP P6000 Command View.
2. Select the appropriate storage system in the Navigation pane. The Initialized Storage System Properties window for the selected storage system opens.
3. Click Shut down. The Shutdown Options window opens.
4. Under System Shutdown click Power Down. If user want to delay the initiation of the shutdown, enter the number of minutes in the Shutdown delay field. The controllers complete an orderly shutdown and then power OFF. The disk enclosures then power OFF. Wait for the shutdown to complete.
5. Turn OFF the power to the rack power distribution units. Even though the disk enclosures are powered off in Step 4, unless the power on the rack distribution units are turned off, the I/O modules remain powered on in a standby state.
The shutdown process performs the following functions in the indicated order:
1. Flushes cache
2. Removes power from the controllers
3. Disables cache battery power
4. Removes power from the drive enclosures
5. Disconnects the system from HP P6000 Command View
Shutting down the storage system from the array controller:
1. Turn OFF the power switch on the rear of each HSV controller.
2. Turn OFF the circuit breakers on both of the EVA rack Power Distribution Units (PDU).
3. If management server is an SMA and you are not using it to manage other storage arrays, shut down the SMA. From the SMA user interface, click Settings, Maintenance, Shutdown.
Starting the storage system (Power On the array):
1. Verify that each fabric Fibre Channel switch to which the HSV controllers are connected is powered up and fully booted. The power indicator on each switch should be on.
If you must power up the SAN switches, wait for them to complete their power-on boot process before proceeding. This may take several minutes.
2. If the management server you shut down is an SMA, power it on and wait for it to completely boot. Verify the SMA is running by logging into it using the web interface.
NOTE: Before applying power to the rack, ensure that the power switch on each HSV controller is off.
3. Power on the circuit breakers on both EVA rack PDUs. Verify that all drive enclosures are operating properly. The status indicator and the power indicator should be ON (green).
4. Wait three minutes and then verify that all disk drives are ready. The drive ready indicator and the drive online indicator should be on (green).
5. Power on the upper controller. It takes the role of primary controller.
6. If you want the preferred path setting to be applied, wait three seconds and power on the lower controller. (Otherwise, wait 10 seconds before powering on the lower controller.) It takes the role of secondary controller.
7. Verify that the Operator Control Panel (OCP) display on each controller displays the storage system name and the EVA WWN.
8. Start HP P6000 Command View and verify connection to the storage system. If the storage system is not visible, click HSV Storage Network in the Navigation pane, and then click Discover in the Content pane to discover the array.
NOTE: If the storage system is still not visible, reboot the management server to re-establish the communication link.
9. Check the storage system status using HP P6000 Command View to ensure everything is operating properly. If any status indicator is not normal, check the log files or contact your HP-authorized service provider for assistance.